The same lubricator filter/reservoirs are added to the right side of R2-D2’s center foot with Issue 90!
Monthly Archives: August 2021
Issue 89
In Issue 89, we build and attach the lubricator filter/reservoirs to the left side of R2-D2’s center foot!
Issue 88
We begin construction of R2-D2’s bottom panel with Issue 88!
Issue 87
The Y-shaped Dome Support assembly is built during Issue 87!
Issue 86
R2-D2’s universal computer interface arm and compartment are assembled and attached to the Right Front Body Panel, then all of the Front Body Panels are brought together in Issue 86!
Issue 85
In Issue 85, we add details to the Right Front Body Panel in preparation for assembling the front section of the body. We also attach both Shoulder Fittings to the body framework!
Issue 84
The spacecraft linkage arms and the associated motorized mechanism are assembled and installed in Issue 84!
Issue 83
The Top Ring Section is installed and we attach the Rotary Sensors during Issue 83!
Issue 82
We assemble and fit the last Tool Compartments and the main Ultrasonic Sensors with Issue 82!
Issue 81
It has been a while, but let’s get back to building the R2-D2. In Issue 81, we begin assembly of the final framework ring for the body!