The dome drive motor is fitted to the drive shaft assembly and support in Issue 96!
Monthly Archives: October 2021
Issue 95
We start to assemble the drive shaft that will rotate the dome with Issue 95!
Issue 94
The MicroController Unit (MCU) is installed into R2-D2 during Issue 94!
Issue 93
We enclose the Sensor Control Board and add some brackets to the framework in Issue 93!
Issue 92
The main Battery Box and initial Battery Tester/Charger (but not the batteries) arrive with Issue 92!
Issue 91
In Issue 91, we assemble the Centre Foot and fit the legs of our R2-D2 to the framework!