Return to the BUILD
“This [issue] includes the first part of the bottom layer of the head frame, which has mountings for the projector and status display. You have also received a number of screws and nuts to use during the next [issues] of assembly.”
Contents
Parts
Materials: The only part in this issue, the Dome Frame, is plastic.
Hardware
Type | Quantity | Size | Color | Head | For |
---|---|---|---|---|---|
Screw | 12 | 2x6 mm | Silver | Pan | Metal |
Nut | 10 | 2x4 mm | Silver | ||
Screw | 5 | 2.3x6 mm | Black | Pan | Plastic |
Screw | 5 | 2.3x3 mm | Black | Countersunk | Plastic |
Magazine
- Building The Galaxy – Location, Location, Location
- Droid Directory – IG-Series Assassin Droids
- Understanding Robotics – The History of Computer Control
- Build R2-D2: Model Instructions
Build
Extending the Head Frame
Steps 1-4
Align the Dome Frame in this issue with the dome chassis assembly from the previous issue aligning the mounting bracket holes:
This can be aligned using these tiny matching arrows:
Steps 5-6
While holding the Dome Frame in place, fit a 2×4 mm nut into each hexagonal recess and secure with two (2) 2×6 mm silver screws:
Thoughts
This issue requires paying attention to the location of the Dome Frame as there are no other frames to align against. The small arrows really help get this in the right place.
Next Up
Issue 17 – Dome Frame, Infrared/Motor Cables