ISSUE 58

 Return to the BUILD


“This [issue’s] parts enable you to continue putting together the outer shell for R2-D2’s dome and add the base to his left foot. Keep the powerbus cables for fitting in the next [issue], which will complete the left foot.”

 

Contents


Parts

Materials: The Foot Base is plastic, the Dome Panel is metal, and the Powerbus Cables have metal ends with a braided cord in between.

Hardware

TypeQuantitySizeColorHead TypeFor
Screw152.3x6 mmBlackPanPlastic

Magazine

  • Building The Galaxy – Filming in the Forest
  • Droid Directory – BB-8 Astromech Part 1
  • Understanding Robotics – Cobots
  • Build R2-D2: Model Instructions

Build


Fitting the Dome Panel

Step 1

Take the Dome Panel supplied and use the two strips of tape to stick it into this hole in the dome:

Since we have already installed a few of these panels already, there is no need to break down the steps each time. This is the final result:

Fitting the Left Foot Base

Steps 1-3

Retrieve the leg assembly from the previous issue, align the Foot Base over the wheel and sensor, and press into place:

Step 4

Secure the Foot Base into place with six (6) 2.3×6 mm black screws:

Thoughts


The left leg is now two issues from completion!

Next Up


 Issue 59 – Dome Panel, Left Fuel Cell Inner/Outer Covers, Quick-Release Fuel System Latches, Plugs

2 thoughts on “ISSUE 58”

Leave a Reply

Your email address will not be published. Required fields are marked *