ISSUE 67

 Return to the BUILD


“With the head and leg assembly completed, this [issue] sees you start to assemble R2-D2’s body. The construction is similar to his dome, with a metal and plastic framework that supports the internal electronics and external panels – but this time, you start building from the bottom up.”

Over the next 14 issues, we will be alternating between building the internal frame and the outer body panels.

Contents


Parts

Materials: Everything is metal in this issue.

Hardware

TypeQuantitySizeColorHead TypeFor
Screw52.5x6 mmSilverCountersunkMetal
Screw32x4 mmSilverPanMetal
Screw32.3x4 mmBlackPanPlastic
Screw22.3x6 mmBlackPanPlastic
Screw32.3x6 mmBlackFlangedPlastic

Magazine

  • Building The Galaxy – Last-Minute Alterations
  • Droid Directory – Triple-Zero (0-0-0) Protocol Droid
  • Understanding Robotics – Robotic Vision
  • Build R2-D2: Model Instructions

Build


Assembling the Bottom Frames

Steps 1-2

Fit one Bottom Support to one Bottom Plate, aligning the locating pin on the support into this hole of the plate, as shown:

Step 3

Join the parts from underneath with one (1) 2.5x6mm silver countersunk screw:

Step 4

Attach the other Bottom Support to the other end of the plate in the same fashion with one (1) 2.5×6 mm silver countersunk screw:

Steps 5-6

Mirroring the first, attach the other Bottom Plate to the two supports with two (2) more 2.5×6 mm silver countersunk screws:

Thoughts


Four screws and four parts make for a very short issue. But, we have started to build the frame for the body! Keep this assembly nearby as it will be used again in Issue 71.

Next Up


 Issue 68 – Right Rear Body Panel, Shoulder Seal, Rear Internal Plate/Grille, Heat Exhaust Shell/Grille

Leave a Reply

Your email address will not be published. Required fields are marked *